Fire safety lobby
A fire safety lobby is a small area in front of the escape stair that stops fire and smoke passing into the stair. It is separated by walls resisting fire for at least 120 minutes and a smoke-tight door resisting fire for at least 90 minutes; its floor area is 3–6 m² and its length in the direction of escape at least 1.8 m.
Lobby doorOpens onto the floor, closed
Stair doorStair side clear
- Wall fire resistance
- At least 120 minutes
- Door fire resistance
- At least 90 min, smoke-tight
- Floor area
- 3–6 m²
- Length in the direction of escape
- At least 1.8 m
- In front of the firefighting lift
- 6–10 m²
01 When it is required
When is a fire safety lobby required?
Section of a 17-storey building with two basements: stair and lobby on the left; firefighting lift, lobby and stair on the right. Choose a case; the floors that need a lobby turn orange.
Building with a total height exceeding 51.50 m
Building height (total) is the combined height of all storeys, basements included. In a building exceeding 51.50 m, a fire safety lobby is built in front of the escape stair; these buildings also have at least one firefighting lift.
ExampleIn an office tower 66.50 m high including the basement, there is a lobby in front of every escape stair on every floor.
Source: BYKHY 4(1)(bbb), 34(7), 63(2)
Building with a firefighting lift
In a building with a firefighting lift, a lobby is built in front of the escape stair and the firefighting lift opens into this lobby. The lobby in front of the lift is 6–10 m² on every floor and also gives access to the stair.
ExampleThe core on the right of the section: the lift, lobby and stair meet in the same lobby on every floor.
Source: BYKHY 34(7), 63(3)
Stair down to the basement
If the typical floor stair also goes down to the basement and serves more than 4 storeys including basements, the stair is entered through a lobby on basement floors. In a residential basement used for a different purpose, a lobby is also built in front of the common stair.
ExampleIn the section, the stair entrances on the −3.50 and −7.00 levels are through the lobby.
Source: BYKHY 46(2)(a), 48(6)
High-rise residential building
In a residential building with a total height of 30.50–51.50 m, at least one of the two protected escape stairs has a lobby or pressurisation. In a residential building exceeding 51.50 m, at least two escape stairs with lobbies and pressurisation are built.
ExampleIn the section, the stair on the left has a lobby in front of it; the stair on the right can be pressurised.
Source: BYKHY 48(5)(c), 48(5)(ç)
Existing building
In an existing non-residential building with a total height exceeding 30.50 m, where the escape stair is entered directly without passing through an area such as a lobby or corridor and the stair is not pressurised, Article 34 applies to the lobby.
ExampleIn an old office building where the unpressurised stair is entered directly from the office floor, the lobby is built to the size and door requirements on this page.
Source: BYKHY 149(1)(a)
02 What goes in the lobby
What is required in a fire safety lobby?
First the floor door from inside the lobby, then the lobby door from the stair; tapping a tab fixes the view.
1 / 2 · From inside the lobbyThere is a fire on the floor; the lobby is empty and clear, the floor door is closed.
- Floor doorAt least 90 minutes, smoke-tight; self-closing.
- WallThe lobby is separated by walls resisting fire for at least 120 minutes; no combustible material is used.
- FloorThe lobby floor and ceiling are also non-combustible; the lobby is kept clear, with no appliances or shaft access panels.
Source: BYKHY 34(2), 41(9), 47(3)
2 / 2 · From the stairThe escape direction is from the floor into the lobby, and from the lobby into the stair. The lobby door opens towards the stair.
- Lobby doorOpens in the direction of escape; if there are more than 100 people on the floor, without a lever handle, with a force of no more than 110 N.
- StairWith pressurisation, the pressure in the stair is kept higher than in the lobby.
- LobbyFloor area 3–6 m², length in the direction of escape at least 1.8 m.
Source: BYKHY 34(3), 47(5), 47(6), 89(6)
03 How many m²
How many m² must a fire safety lobby be?
Two detail plans: A, a lobby in front of the stair; B, a lobby in front of the firefighting lift. Tap a rule; its counterpart on the plan is highlighted in orange.
Lobby 3–6 m², at least 1.8 m in the direction of escape
The lobby floor area may not be less than 3 m² or more than 6 m²; its dimension in the direction of escape is at least 1.8 m. The lobby is designed so that it does not obstruct movement along the escape route.
ExampleIn plan A, the lobby is 2.00 × 2.60 m = 5.2 m²; 2.00 m in the direction of escape.
Source: BYKHY 34(1), 34(3)
Wall resists fire for 120, door for 90 minutes
The lobby is separated from other areas by walls resisting fire for at least 120 minutes and a smoke-tight door resisting fire for at least 90 minutes. No combustible material is used in its walls, ceiling or floor.
ExampleThe lobby's glazed wall also carries the 120-minute class, with its certificate; its door is rated for 90 minutes and smoke-tight.
Source: BYKHY 34(2)
Doors are self-closing
Lobby doors are fitted with a self-closing device and allow the fire brigade to enter from outside. If there are more than 100 people on the floor, they open in the direction of escape without a lever handle; the opening force is no more than 110 N.
ExampleIn the plan, the floor door opens towards the lobby and the lobby door towards the stair.
Source: BYKHY 47(3), 47(5), 47(6)
No shaft access panels or appliances in the lobby
No electrical or mechanical service shaft access panel opens into the lobby; no combi boiler, outdoor air-conditioning unit, meter or similar appliance is placed there. The building owner and managers are responsible for keeping the lobby clear.
ExampleIn the plan, the shaft stays in the corridor and its access panel opens onto the corridor.
Source: BYKHY 41(9), 34(8)
Firefighting lift lobby 6–10 m²
The lobby in front of the firefighting lift is 6–10 m², no dimension is less than 2 m, and it gives access to the stair. The floor has a fall of no more than 1/200 towards the exit door.
ExampleIn plan B, the lobby is 3.00 × 2.80 m = 8.4 m²; the lift door opens into the lobby.
Source: BYKHY 34(4), 34(5), 63(3)
Pressure in the stair higher than in the lobby
If the lobby is also pressurised, pressure is distributed so that it is higher on the stair side than on the lobby side. The force needed to open the door is no more than 110 N.
ExampleIn plan A, the stair is at higher pressure and the lobby at lower pressure.
Source: BYKHY 89(6), 89(7)
04 Four locations
Where are fire safety lobbies most often built?
Four locations; in all four the lobby carries the same wall and door requirements. Choose a location to highlight what is required of the lobby there.
Fire side
Lobby
- In front of the stair in a high-rise building In a building whose total height exceeds 51.50 m, there is a lobby in front of every escape stair. This small area between the floor door and the stair door keeps smoke away from the stair. BYKHY 34(7), 34(2), 34(3)90 High-rise building page
- In front of the firefighting lift The firefighting lift opens into the lobby in front of the stair. On every floor this lobby is 6–10 m², no dimension is less than 2 m, and it gives access to the stair. BYKHY 34(4), 34(7), 63(3)90
- Stair entrance in the basement If the stair also goes down to the basement and serves more than 4 storeys including basements, the stair is entered through a lobby on basement floors. In the basement, the lift is also reached through a protected corridor or lobby. BYKHY 46(2)(a), 62(4)90 Fire escape stair door page
- In front of the stair in a high-rise residential building In a residential building with a total height of 30.50–51.50 m, at least one of the two escape stairs has a lobby or pressurisation in front of it; in a residential building exceeding 51.50 m, both stairs have a lobby. BYKHY 48(5)(c), 48(5)(ç)90 High-rise building page
05 Your project
Does your project need a fire safety lobby?
These four answers decide whether a lobby is needed and how large it must be.
- 01
What is the building height (total)?
Measured including basements. The 30.50 m and 51.50 m thresholds change when a lobby is needed and at how many stairs.
- 02
Is there a firefighting lift?
If there is, the lift opens into the lobby in front of the stair and this lobby is 6–10 m².
- 03
Does the stair go down to the basement?
For a stair serving more than 4 storeys including basements, basement entrances are through a lobby.
- 04
Is the building residential, or existing?
In residential buildings, the number of stairs and pressurisation decide the lobby; in existing buildings, how the stair is entered.
Let's define the lobby door and glazed wall together. Send us the floor plan and the building height and our technical team will review it.
Send the project06 Glazed lobby
Can we make the fire safety lobby glazed?
The door and glass wall are made with Aliplast profiles and Polflam glass to the duration the lobby requires.
Lobby door
Up to EI90
Aliplast FR90 single-leaf glazed door; for the lobby's 90-minute door. Single leaf
Lift lobby
Double leaf
FR90 double-leaf glazed door for wide lobby entrances. Double leaf
Lobby wall
EI120 glass
A 120-minute glazed wall with FR90 partition and Polflam BR glass. Frameless glass partition
The lobby door must be smoke-tight; the door's document set is checked together with its type and size. Aliplast FR90
Abay Yapı Sistemleri
Trusted for 30 years.
We manufacture lobby doors and glazed walls with Aliplast profiles and Polflam glass in our Istanbul workshop, to each project's dimensions.
- 154
- corporate references
- Aliplast
- authorised manufacturer and distributor in Turkey
- Polflam
- partner for fire-resistant glass
- Istanbul
- head office and production, Istanbul



- 01Project and useBuilding type, required rating, door location
- 02Size and openingOverall size, clear width, opening direction
- 03System and hardwareProfile, glass, lock, closer
- 04Quote and productionScope agreed, delivered with the document set
Projects
Lobby and stair entrances from our reference projects.
Top row: our doors at lobbies, lift lobbies and stair entrances; below: other escape doors. Tap a photo; browse with the arrows.
07 Document set
Which documents are required for the door and glass of a fire safety lobby?
The lobby wall carries a 120-minute requirement, and its door 90 minutes and smoke tightness; each is shown by documents.
Four checks at handover
- Door fire resistance. The minutes in the report must be at least 90.
- Smoke tightness. Look for the smoke tightness class on the door's certificate.
- Glazed wall. The report for the glass partition in the lobby wall must be at least 120 minutes.
- Declaration and CE. A separate declaration of performance for the door and the glass wall, and CE marking on both.
- ClassificationLobby door classification reportWith its type and sizeRequest it
- ClassificationGlass wall classification reportWith height and pane sizeRequest it
- DeclarationDeclaration of performanceCE markedRequest it
- DrawingLobby door and wall junction detailsDWGRequest it
Source: Turkish Construction Products Regulation 6(1), 10(2)
Ask for the lobby door document set. Documents are sent together with the door's type and size.
Request the document set08 FAQ
About fire safety lobbies
Whether a lobby is needed, and its size, is decided by the project designer, the fire consultant and fire brigade approval. The articles are here; let's work out together what they mean for your project.
What is a fire safety lobby?
An area built to stop fire and smoke passing into escape stairs. It keeps smoke away from the stair, is used by the fire brigade and rescue teams, and, where needed, people with disabilities and the injured wait here.
Source: BYKHY 4(1)(ss), 34(1)
When is a fire safety lobby mandatory?
A lobby is built in front of the escape stair in buildings with a total height exceeding 51.50 m and in buildings with a firefighting lift. For a stair serving more than 4 storeys including basements, basement entrances are through a lobby. In a 30.50–51.50 m residential building, at least one of the stairs has a lobby or pressurisation.
Source: BYKHY 34(7), 46(2)(a), 48(5)(c)
How many m² must a fire safety lobby be?
Floor area 3–6 m², dimension in the direction of escape at least 1.8 m. The lobby in front of the firefighting lift is 6–10 m² and no dimension is less than 2 m.
Source: BYKHY 34(3), 34(4)
How many minutes must a fire safety lobby door resist fire?
The lobby is separated by a smoke-tight door resisting fire for at least 90 minutes and walls resisting fire for at least 120 minutes. The doors are self-closing and allow the fire brigade to enter from outside.
Source: BYKHY 34(2), 47(3)
What is not allowed in a fire safety lobby?
No electrical or mechanical shaft access panel opens into the lobby; no appliances such as combi boilers, outdoor air-conditioning units or meters are placed there. No combustible material is used in the walls, ceiling or floor, and the lobby is kept clear.
Source: BYKHY 41(9), 34(2), 34(8)
What must a firefighting lift lobby be like?
On every floor, a lobby of 6–10 m² with no dimension less than 2 m that also gives access to the escape stair. The floor has a fall of no more than 1/200 towards the exit door.
Source: BYKHY 63(3), 34(4), 34(5)
Is a fire safety lobby pressurised?
If the lobby is also pressurised, the pressure in the stair is kept higher than in the lobby. In a 30.50–51.50 m residential building, at least one of the stairs has a lobby or pressurisation; in a residential building exceeding 51.50 m, there are two stairs with lobbies and pressurisation.
Source: BYKHY 89(6), 48(5)(c), 48(5)(ç)
→ Quote
Tell us about your lobby door and glass.
Building height, lobby location and size, door and glass wall: our technical team will determine the class and document set and get back to you.