C5Fire criteria · location

Boiler room door

A boiler room door is rated for at least 90 minutes, is smoke-tight and self-closing. It opens not directly onto an escape stair but onto a common lobby or corridor. A boiler room with a heat output of 50–350 kW has at least one exit door; one over 100 m² or 350 kW has at least two, positioned opposite each other.

Boiler room fire door Turkey – glazed door in a basement corridor
Boiler room door in a basement
Fire resistance of the door
At least 90 min, smoke-tight
Wall fire resistance
At least 120 minutes
Door closing
Self-closing
Where the door opens
Common lobby or corridor
Number of exit doors
Over 100 m² or 350 kW: 2

01 How many doors

How many exit doors should a boiler room have?

The number of doors is set by the boilers' total heat output (kW) and the boiler room's floor area. Enter both values; the plan changes with the number of doors.

1exit door is enoughminimum · this boiler room

250 kW and 80 m²: a boiler room between 50 and 350 kW and not exceeding 100 m² has at least one exit door.

Every door is rated for at least 90 minutes, smoke-tight and self-closing.

  • ExtinguisherIn every boiler room, 6 kg
  • Fire hose cabinetMandatory above 350 kW
  • Mechanical smoke extractionMandatory above 2,000 m²

Source: BYKHY 54(5), 54(8), 94(1)(b)(1), 88(3)

12345ABCDTKmeter · valve · panelBOILER ROOM85.2 m²fuelstorestairstoragecar parkcommon corridorcommonlobbystoragejoint12.00 m7.10 mBASEMENT PLAN · BOILER ROOM0 – 5 mK
Boiler room120 min wallEscape direction

02 What the door needs

What should you check in a boiler room door?

First the boiler room door from the corridor, then the second exit of a large boiler room; tapping a tab locks the view.

Boiler room fire door Turkey – single leaf, common corridor

1 / 2 · From the corridorThere is a fire in the boiler room; the door is closed and the corridor is clear.

Door≥ 90 minClosingSelf-closing

  1. DoorRated for at least 90 minutes and smoke-tight.
  2. Door closerThe door is self-closing; it is not left open.
  3. Meter and valveGas meter, main valve and switchboard outside the boiler room, in the corridor.

Source: BYKHY 54(5), 55(2), 55(3)

03 Where it opens

Where does a boiler room door open?

Basement floor plan: a 146 m² boiler room, common corridor, escape stair and fuel store. When you tap a rule, its location is drawn in orange on the plan.

The door opens onto a common lobby or corridor, not onto the stair

A boiler room door does not open directly onto an escape stair or a general-use stair; it must always open onto a common lobby or corridor. The stair is reached through this lobby or corridor.

ExampleOn the plan both doors open onto the common corridor and common lobby; the stair door is in the corridor.

Source: BYKHY 54(4)

12345ABCDTKmeter · valve · panelBOILER ROOM146.3 m²fuelstorestairstoragecar parkcommon corridorcommonlobbyjoint20.60 m7.10 mBASEMENT PLAN · BOILER ROOM0 – 5 mK152346
Boiler room120 min wallEscape direction

04 Four locations

Where is a boiler room most often located in a building?

Wherever the boiler room is, its door meets the same requirements. Choose a location; the door's requirements are marked alongside.

05 Your project

Which door does your boiler room need?

These four answers set the number, location and type of doors.

  1. 01

    What is the boilers' total heat output in kW?

    The 350 kW threshold changes the number of doors and the fire hose cabinet requirement.

  2. 02

    How many m² is the boiler room?

    A boiler room over 100 m² has at least two exit doors.

  3. 03

    Which fuel is used?

    With natural gas and LPG the meter, valve and switchboard are outside; with liquid fuel the store is separated by a 120-minute partition.

  4. 04

    Where does the door open?

    The door opens onto a common lobby or corridor, not onto the stair; door locations are read from the plan.

Let us specify your boiler room doors together. Send the basement plan, boiler output and fuel type; our technical team will review them.

Send the project

06 Glazed door

Can a boiler room door be glazed?

The door and, where needed, a glazed partition are made with Aliplast profiles and Polflam glass to the rating the boiler room requires.

  1. Boiler room door

    Up to EI90

    Aliplast FR90 single-leaf glazed door for the boiler room's 90-minute exit door. Single leaf

  2. Large heating plant

    Double leaf

    FR90 double-leaf glazed door for wide boiler room entrances. Double leaf

  3. Boiler room wall

    EI120 glass

    If glass is needed in the boiler room wall, a 120-minute partition with Polflam BR glass. Frameless glass partition

Smoke-tightness is a requirement of the article for this door; the document set is also checked against the door type and size. Aliplast FR90

Abay Yapı Sistemleri

Trusted for 30 years.

We make boiler room doors with Aliplast profiles and Polflam glass, to each project's dimensions in our Istanbul workshop.

154
corporate references
Aliplast
authorised manufacturer and distributor in Turkey
Polflam
partner for fire-resistant glass
Istanbul
head office and production, Istanbul
Boiler room fire door project Turkey – bronze-framed single leaf at an escape exitBoiler room fire door project Turkey – single leaf and glass partition in an open-plan officeBoiler room fire door project Turkey – single leaf with side light at a corridor entranceBoiler room fire door project Turkey – wood-effect door with side and top lights
Building exit door · Single leaf
  1. 01Project and useBuilding type, required rating, door location
  2. 02Size and openingOverall size, clear width, opening direction
  3. 03System and hardwareProfile, glass, lock, closer
  4. 04Quote and productionScope agreed, delivered with the document set

Projects

Single and double-leaf fire doors from our reference projects.

Top row: our single-leaf glazed fire doors; bottom row: double-leaf and wide passage doors. Tap a photo; browse with the arrows.

07 Document set

Which documents are required for a boiler room door?

The door must meet the 90-minute, smoke-tightness and self-closing requirements; each is shown with certification.

Four checks at handover

  1. Rating. The classification report must state a fire resistance of at least 90 minutes for the door.
  2. Smoke. The same report must also include a smoke-tightness class.
  3. Self-closing. The door closer must be the same as the hardware the door was tested with.
  4. Declaration and CE. A declaration of performance and CE marking for the door.
  • ClassificationDoor classification reportWith type and sizeRequest
  • DeclarationDeclaration of performanceCE markedRequest it
  • HardwareDoor closer and lock listHardware as testedRequest
  • DrawingDoor and wall junction detailsDWGRequest

Source: Turkish Construction Products Regulation 6(1), 10(2)

Request the document set for the boiler room door. Documents are sent together with the door type and size.

Request the document set

08 FAQ

About boiler room doors

The number and location of boiler room doors are set by the project architect, the mechanical engineer and fire brigade approval. The rules are on this page; let us look together at how they apply to your boiler room.

0216 428 38 20Send a question

How many minutes must a boiler room door resist fire?

Boiler room exit doors are rated for at least 90 minutes, are smoke-tight and self-closing. The boiler room walls are rated for at least 120 minutes.

Source: BYKHY 54(5), 54(2)

How many doors should a boiler room have?

A boiler room with a heat output of 50–350 kW has at least one door. A boiler room with a floor area over 100 m² or a heat output over 350 kW has at least two exit doors, positioned as far as possible opposite each other.

Source: BYKHY 54(5)

Where should a boiler room door open?

A boiler room door does not open directly onto an escape stair or a general-use stair; it must always open onto a common lobby or corridor.

Source: BYKHY 54(4)

What should the boiler room walls be like?

The boiler room is separated from the rest of the building by partitions rated for at least 120 minutes and is located centrally, in one piece. Its walls and floor slabs have the quality of compartment walls; no building movement joint passes through the boiler room.

Source: BYKHY 54(2), 24(2)

Is a fire hose cabinet required in a boiler room?

A fire hose cabinet is mandatory in a boiler room with a heat output over 350 kW; in existing buildings this threshold is 500 kW. Every boiler room has at least one 6 kg multi-purpose dry chemical powder extinguisher.

Source: BYKHY 94(1)(b)(1), 164(2), 54(8)

Where are the meter and valve in a natural gas boiler room?

The meters are placed outside the boiler room. The main shut-off valve, main circuit breaker and main electrical switchboard are outside the boiler room, in an easily accessible place. A gas detector is used in the boiler room; a boiler room using LPG is not built in a basement.

Source: BYKHY 55(2), 55(3), 55(5), 55(10)

How is the fuel store separated from the boiler room?

The fuel store is a separate space protected by fire-rated partitions and is separated from the boiler room by a partition rated for 120 minutes. The store has ventilation and a bund that will hold at least one third of the tank capacity.

Source: BYKHY 56(1)

→ Quote

Describe your boiler room door.

Boiler output, boiler room area and door locations: our technical team will set the door type, class and document set and get back to you.

Call · 0216 428 38 20Email

Production
Istanbul

Quote form* required field

CallRequest a quote