B1Documents and compliance
For the fire brigade and occupancy permit Fire door documents
A new building in which work not complying with the Regulation is found is not granted an occupancy permit until the deficiencies are remedied. A glazed fire door's compliance is shown with documents: a classification report issued for the door's own type and size, the glass declaration, the metal label on the frame, the invoice and the manufacturing authorisation from the system owner. The exact list is set by the fire brigade and the building inspection firm.
Metal plate
- Occupancy permit
- Granted for compliant work
- Certificate
- Issued after testing
- Declaration of performance
- Drawn up by the manufacturer
- Door and adjacent fixed glazing
- Reported separately
- Responsible parties in the Regulation
- Including the manufacturer
01 Document set
Which document set is prepared for your door?
Choose the product and rating; the elevation shows where the label and stamp are.
1Product
2Fire resistance, minutes
5itemsdocument set
Single-leaf door, 90 minutes of fire resistance (EI 90): the report is issued for the door's own type; the project leaf is no larger than the one tested in the report.
- 1ReportFR90 single-leaf test report · ITB 2020
- 1ReportFixed glass partition report
- 2GlassPolflam EI 90 declaration · 32 mm
- 3LabelMetal label on the frame
- ·AuthorisationAliplast manufacturing authorisation
- ·InvoiceManufacturer's invoice
Source: BYKHY 4(1)(ğğ), 5(1); Construction Products Regulation 6(1); Aliplast and Polflam catalogues
02 What the door needs
What do you check on the door at delivery?
First the label and stamp on the single-leaf door, then the separate reports for the door and the fixed glazing; tap to fix the view.
1 / 2 · What to check on a single-leaf doorCamera on the escape side; fire behind the glass.
- LabelThe metal label on the frame shows the class, system, serial number and glass.
- Glass cornerThe etched stamp in the corner shows the glass brand and class.
- CloserThe closer, hinges and lock are the same as the hardware the door was tested with.
Source: Aliplast FR90 single-leaf test report (ITB, 2020); BYKHY Annex 3/A
2 / 2 · Door and fixed glazing: two reportsThe fixed glazing beside and above is documented separately from the door.
- DoorThe class of the door in the middle is shown by the door's own report.
- Side lightThe fixed side light is documented by the partition report; the door report does not replace it.
- Top lightThe glass above is also part of the partition; no pane is larger than the one in the report.
Source: Abay document check note; BYKHY 4(1)(ğğ)
03 Document chain
How does a document get from the laboratory to the building?
Profile and glass are tested together, the report goes to the manufacturer and the door to the building. Select a rule; its place in the chain turns orange.
A certificate is issued by testing
Under the Regulation, a certificate is a document issued by TSE, or by an international approval body accepted by TSE, on the basis of testing, showing that the product conforms to the relevant standard.
ExampleIn a fire test at the accredited ITB laboratory in Poland, Aliplast FR90 kept out flame and smoke for 103 minutes.
Source: BYKHY 4(1)(ğğ)
Turkish standards first, then European
On matters where the Regulation has no sufficient provision, Turkish Standards apply, or failing those, European Standards; on matters covered by neither, internationally accepted standards may be used.
ExampleThe FR90 single-leaf test report was issued to EN 1634-1 and EN 16034.
Source: BYKHY 5(2)
No CE marking on a product without a declaration
For a construction product covered by a harmonised standard, the manufacturer draws up a declaration of performance. A product for which no declaration of performance has been drawn up cannot carry the CE marking.
ExamplePolflam fire-resistant glass has EI30–EI120 declarations of performance; a declaration describes the glass and does not replace the report for the door or partition.
Source: Turkish Construction Products Regulation 6(1), 10(2)
The manufacturer is among the responsible parties
The administration issuing the permit, the investor, the building owner, the architects and engineers in design and construction, the contractors, the manufacturers and the building inspection firm are responsible for implementing the Regulation.
ExampleWe manufacture the doors in our Istanbul workshop under Aliplast's manufacturing authorisation; that is why the authorisation is part of the set.
Source: BYKHY 6(1)
No compliant work, no occupancy permit
If work not complying with the Regulation is found in a new building or a building whose use has changed, no occupancy permit or business licence is issued until the deficiencies are remedied.
ExampleAt delivery, the door's label, report and invoice are presented together; all three identify the same door.
Source: BYKHY 5(1)
What do the letters in the class mean?
In the Regulation's symbol table, E stands for integrity, I for insulation, C for self-closing and S for smoke leakage; the number next to the letters is minutes.
ExampleA door labelled EI 60 keeps both its integrity and its insulation for 60 minutes in a fire.
Source: BYKHY Annex 3/A
04 Four products
Why does each product type have its own documents?
Single-leaf, double-leaf, side-light door and fixed partition: choose a product and what its document must show is marked alongside.
Fire side
Escape side
- On a single-leaf door Each test report covers the door type tested. In the fire test at ITB, Aliplast FR90 kept out flame and smoke for 103 minutes; the door is delivered with a label on its frame. BYKHY 4(1)(ğğ), Ek-3/A30–90 Single-leaf page
- On a double-leaf door A double-leaf door has its own report; the single-leaf report does not cover it. The 60-minute classification of the FR90 double-leaf door is in report FIRES-CR-178-17-AUPE. BYKHY 4(1)(ğğ)30–90 Double-leaf page
- On a door with side lights The door in the middle and the fixed glazing beside and above it are documented by two separate reports; every glass pane has an etched stamp in its corner. BYKHY 4(1)(ğğ)30–90 Side-light door page
- In a fixed glass partition The partition's class is shown by its own report; a door in the partition is documented separately by its own report. The glass declaration of performance describes the glass only. BYKHY 4(1)(ğğ) · CPR 6(1)30–120 Fixed glass partition page
05 Your project
What determines your project's document set?
These four answers determine what the set contains.
- 01
What are the door's type and size?
The report is issued for the door's own type; the project leaf is no larger than the one tested in the report.
- 02
How many minutes are required?
The duration required by the door's location is met by the class on the label and in the report.
- 03
Is there fixed glazing beside the door?
A separate partition report is prepared for the fixed glazing beside and above the door.
- 04
Which project are the documents for?
Enter your company and project name; the set is prepared for that project's doors.
Send your door list and we will work out the document set together. Door types, sizes and ratings are enough; our technical team will take a look.
Send the list06 Products
Which product's documents are on which page?
Each product page ends with that product's document list.
Doors
Glazed fire doors
Reports for single, double, side-light and automatic sliding doors. Glazed fire door
Partitions
Fire-rated glass partition
Test results for framed and frameless partitions. Glass partition
Glass
Polflam fire-resistant glass
Declarations of performance for EI30–EI120 glass. Fire-resistant glass
The duration and class required by the door's location are shown on the criteria pages. Fire criteria
Abay Yapı Sistemleri
Trusted for 30 years.
We manufacture doors and partitions to the project's sizes in our Istanbul workshop, under Aliplast's manufacturing authorisation and with Polflam glass.
- 154
- corporate references
- Aliplast
- authorised manufacturer and distributor in Turkey
- Polflam
- partner for fire-resistant glass
- Istanbul
- head office and production, Istanbul



- 01Project and useBuilding type, required rating, door location
- 02Size and openingOverall size, clear width, opening direction
- 03System and hardwareProfile, glass, lock, closer
- 04Quote and productionScope agreed, delivered with the document set
Projects
Doors from our reference projects delivered with their documents.
Top row: our single-leaf and side-light doors; bottom row: double-leaf doors and partitions. Tap a photo; browse with the arrows.
07 Our documents
Fire documents held by Abay Yapı
The first page and full text of the reports are shared with your company and project details.
Four comparisons at delivery
- Type. The product tested in the report is the same type as the project door: single leaf, double leaf or partition.
- Size. The leaf and glass panes in the project must not exceed the specimen in the report.
- Glass. The glass on the stamp must be the same glass tested together with the profile in the report.
- Manufacturer. The manufacturer on the label and invoice must be the same company named in the authorisation.
- Test reportFR90 single-leaf glazed doorITB 2020 · kept out flame and smoke for 103 minutesRequest it
- Test reportFR90 double-leaf glazed doorITB 2020 · no flame passage for 98 minutesRequest
- ClassificationFR90 double leaf · 60 minutesFIRES-CR-178-17-AUPERequest it
- Test resultFrameless partition · 120 minutesPolflam BR EI120 + Aliplast FR90Request it
- DeclarationPolflam fire-resistant glassEI30–EI120 declarations of performanceRequest it
- AuthorisationAliplast manufacturing authorisationAuthorised manufacturer and distributor in TurkeyRequest it
Source: Aliplast and Polflam documents
Request the document set for your doors. Give the product type, rating and project name; the set is prepared accordingly.
Request the document set08 FAQ
About fire door documents
Which document covers which door is confirmed by the door's type and size. Send your door list and we will prepare the document set for your project.
Which documents does the fire brigade ask for a fire door?
The exact list is set by the fire brigade and the building inspection firm. The Regulation states that a new building in which non-compliant work is found will not be granted an occupancy permit. At delivery we present the classification report for the door's own type, the glass declaration of performance, the metal label on the frame, the invoice and the manufacturing authorisation together.
Source: BYKHY 5(1)
What is a fire door certificate?
Under the Regulation, a certificate is a document issued by TSE, or by an international approval body accepted by TSE, on the basis of testing, showing that the product conforms to the relevant standard. For a glazed fire door, this is the report of the door's furnace test.
Source: BYKHY 4(1)(ğğ)
Are a test report and a classification report the same thing?
No. A test report records the results of the furnace test; a classification report uses those results to set the door's class, for example EI 60. The FR90 single-leaf test report is ITB's 2020 report; the 60-minute classification of the double-leaf door is FIRES-CR-178-17-AUPE.
Source: Aliplast FR90 documents
What is the metal label on the door for?
The label links the door to its documents: it shows the class, system, serial number and glass. At delivery, the label details are compared with the door in the classification report and the manufacturer on the invoice.
Source: BYKHY Annex 3/A
Is the fire-resistant glass document enough for the door?
No. The glass declaration of performance describes the glass only. How many minutes the door or partition resists is shown by the report in which glass and profile were tested together; the project also uses the glass from the test.
Source: Construction Products Regulation 6(1)
What is a manufacturing authorisation?
It is a document showing that a system owner has authorised a company to manufacture and install its system. It shows that the manufacturer presenting Aliplast's report is authorised to manufacture that system. Abay Yapı is Aliplast's authorised manufacturer in Turkey.
Source: Aliplast manufacturing authorisation
How is the declaration of performance related to the CE marking?
For a construction product covered by a harmonised standard, the manufacturer draws up a declaration of performance, and a product without a declaration cannot carry the CE marking. Products without a harmonised technical specification are placed on the market with the G mark.
Source: Construction Products Regulation 6(1), 10(2); Regulation on the Criteria Applicable to Construction Products
→ Quote
Request the document set.
Give your company and project name, door types and ratings: we will prepare the document set for your project and send it to you.
- Phone
- +90 216 428 38 20
- abay@abayyapi.com
- Production
- Istanbul





